HDFS ARRIVAL
Control-M’s HDFS File Watcher waits for the required path and minimum file size before releasing the Tajo job. Missing or undersized data keeps execution gated, preventing the query from starting against an incomplete input.
UPSTREAM DELAY
Control-M models Spark and Tajo as dependent jobs in the same workflow. The Tajo query waits for successful upstream completion instead of relying on a fixed cron window, keeping execution aligned with actual data readiness
COMMAND FAILURE
Control-M runs HDFS pre-commands before Tajo execution and can fail the job when a preparation command fails. The query is stopped before processing compromised inputs, while operators receive a clear job failure to investigate.
QUERY FAILURE
Control-M captures the job outcome within the wider workflow, prevents dependent processing from advancing, and surfaces the failure for operations. Recovery can be coordinated from the same workflow context instead of tracing failures across separate schedules.
SLA RISK
Control-M tracks Tajo as part of the complete service rather than an isolated query. SLA Management monitors the critical job chain and can surface delay risk before the final delivery deadline is missed.
INTEGRATION FACTS
|
workload.types |
Tajo open queries · Tajo input-file jobs · distributed SQL queries · HDFS analytics · batch ETL · ad hoc query execution |
|
trigger.type |
HDFS file arrival · HDFS minimum-size threshold · time schedule · upstream job completion · Control-M event · Automation API submission |
|
cross_tool.deps |
All delivered through Control‑M for Hadoop: HDFS File Watcher · HDFS Commands · Apache Spark · Apache Hive · Sqoop · Java MapReduce · Pig · Oozie workflows · file delivery |
|
cloud.platforms |
On‑premises Hadoop clusters (HDFS) · at least one Control‑M/Agent with Control‑M for Hadoop per cluster · Control‑M SaaS orchestration of the Hadoop cluster |
|
error_handling |
pre-command failure detection · post-command failure handling · downstream dependency gating · job failure alerts · SLA monitoring · controlled recovery |
|
throughput |
distributed SQL workloads · large HDFS datasets · batch ETL · ad hoc analytics · input-file-driven SQL execution |
|
observability |
job execution status · job output · dependency visibility · workflow history · SLA tracking · failure alerts · end-to-end workflow monitoring |
end-to-end orchestration
Control-M orchestrates workflows across Tajo, HDFS, Spark, Hive, Sqoop, file transfers, and Hadoop services in a single job flow — with dependency tracking, SLA visibility, and automated recovery across all of them.
|
Tajo (a Hadoop job type) |
open‑query execution · input‑file execution · pre/post HDFS commands · |
|
workflow dependencies HDFS |
file arrival watching · minimum-size criteria · HDFS commands · data readiness gating |
|
Apache Spark |
Python execution · Java/Scala applications · upstream transformation orchestration |
|
Apache Hive |
Hive job execution · script parameters · Hadoop workflow dependencies |
|
Sqoop |
command execution · data movement orchestration · dependent processing |
|
Oozie |
workflow execution · job properties · coordinated Hadoop processing |
|
Control-M MFT |
managed file movement · delivery dependencies · downstream workflow triggering) |
airflow coexistance
Airflow manages its DAG. Control-M manages everything surrounding it.
airflow handles
control-m adds
MONITOR PIPELINES
Tajo shows what happens inside its distributed query environment; it does not provide the operating view of every external dependency surrounding that query. Control-M connects Tajo execution to the wider production workflow, giving data teams visibility into:
Tajo job execution status
Upstream and downstream dependencies
Job output and failures
End-to-end workflow history
Cross-platform processing status
SLA ASSURANCE
A successful Tajo query can still contribute to a missed delivery when upstream processing starts late or downstream work stalls. Control-M manages the service across the full dependency chain so teams can identify schedule risk before delivery is affected:
End-to-end SLA tracking
Critical-path dependency visibility
Predictive delay detection
Automated failure alerts
Coordinated downstream recovery